Road Stream Crossing Site TBW_TBAC143

Thunder Bay River Watershed, Buff Creek
Richardson Road
Hawes Twp, Alcona County
Information collected by:
Huron Pines
Site Location
GPS Coordinates: 44.69736 , -83.60703
T27N R7E Sec 33
Owned by Private
Fish Passability 0.5
Structure is NOT Perched
Total Erosion: 0.4568 tons/year
Severity: Moderate
Year Inventoried: 2017
Inlet
Outlet
Upstream Conditions
Downstream Conditions
Road Approach - Left
Road Approach - Right
Crossing Information
Type of Crossing: culvert(s)
Number of Structures: 1
Structure Shape: Round
Inlet Type: Projecting
Outlet Type: At Stream Grade
Structure Material: Metal
Structure Substrate: None
General Conditions: Poor
Structure Interior: corrugated
Structure is Rusted through
Dimensions of Structure: Length 48 ft. , Width 4.1 ft. , Height 4.1 ft.
Percentage Plugged: Inlet: 26% to 50%
Percentage Crushed: In Pipe: 1% to 25%
Structure is NOT Perched
Structure Inlet
Water Depth: 0.5 ft.
Embedded Depth of Structure: 0 ft.
Water Velocity*: 1 ft./sec.
Structure Outlet
Water Depth: 0.9 ft.
Embedded Depth of Structure: 0 ft.
Water Velocity*: 0.2 ft./sec.
*Water Velocities were measured at the Surface (with Float Test)
Stream Information
Stream Flow: Less than 1/2 Bankfull
Scour Pool: Length 29 ft. , Width 21 ft. , Depth 3.5 ft.
Riffle Information
Water Depth: 0.5 ft.
Bankfull Width: 13 ft.
Wetted Width: 7.5 ft.
Water Velocity: 0.5 ft./sec. (Measured with Float Test)
Dominant Substrate: Gravel
Road Information
Paved County Road
Road Condition: Fair
Road Width at Culvert: 22 ft.
Location of Low Point: At Stream
Runoff Path: Roadway
Embankments
Upstream
Fill Depth: 15.2 ft.
Slope: Vertical
Downstream
Fill Depth: 16.6 ft.
Slope: 1:1
Approaches
Left Approach
Length: 356 ft.
Slope: 6% to 10%
Vegetation: Heavy
LS Factor: 1.473
Erosion: 0.3813 tons/year
Right Approach
Length: 0 ft.
Slope: 1% to 5%
Vegetation: Heavy
LS Factor: 0.26
Erosion: 0 tons/year
Erosion Information
Total Erosion at Crossing: 0.4568 tons/year
Extent of Erosion: Moderate
Erosion is occurring and corrective actions can be installed to address the problem.
Location of Erosion
Erosion Dimensions
Eroded Material
Material Eroded
Total Erosion
facing downstream
Length
Width
Depth
Reaching Stream?
(tons/year)
Left Upstream Streambank
7 ft.
3 ft.
1.4 ft.
yes
Sand
0.0755
Summary Information
Fish Passability 0.5
Erosion is an area of concern for this site. STATE OF EMBANKMENTS IS UNHEALTHY. OTHER 2 CULVERTS SURROUNDING INLETS HAVE COLLAPSED.
These non-native species were observerd at this site: St. Johns Wort and Autumn Olive