Road Stream Crossing Site TBW_TBMO04

Thunder Bay River Watershed, Thunder Bay River
Lake 15 Road
Briley Twp, Montmorency County
Information collected by:
Huron Pines
Site Location
GPS Coordinates: 44.99279 , -84.17883
T30N R2E Sec 15
Owned by Private
Fish Passability 0
Structure is NOT Perched
Total Erosion: 0.08 tons/year
Severity: Severe
Year Inventoried: 2017
Inlet
Upstream Conditions
Downstream Conditions
Road Approach - Left
Road Approach - Right
Crossing Information
Type of Crossing: culvert(s)
Number of Structures: 3
Structure Shape: Ellipse
Inlet Type: Wingwall 30-70 Degree
Outlet Type: At Stream Grade
Structure Material: Metal
Structure Substrate: None
General Conditions: Good
Multiple Culverts/Spans
Culvert/Span
Width
Length
Height
Material
1
5.9 ft.
32 ft.
3.8 ft.
Metal
2
5.9 ft.
32 ft.
3.8 ft.
Metal
3
5.9 ft.
32 ft.
3.8 ft.
Metal
Structure Interior: corrugated
Dimensions of Structure: Length 32 ft. , Width 5.9 ft. , Height 3.8 ft.
Structure is NOT Perched
Structure Inlet
Water Depth: 2.1 ft.
Water Velocity*: 3.6 ft./sec.
Structure Outlet
Water Depth: 2.2 ft.
Water Velocity*: 2.4 ft./sec.
*Water Velocities were measured 2 ft. below Surface (with Meter)
Stream Information
Stream Flow: Less than Bankfull
Scour Pool: Length 27 ft. , Width 48 ft. , Depth 4.4 ft.
Riffle Information
Water Depth: 2.2 ft.
Bankfull Width: 32 ft.
Wetted Width: 29 ft.
Water Velocity: 3.1 ft./sec. (Measured with Meter)
Dominant Substrate: Gravel
Road Information
Paved County Road
Road Condition: Good
Road Width at Culvert: 24 ft.
Location of Low Point: Other
Runoff Path: Roadway
Fill Depth: 0 ft.
Slope: Vertical
Fill Depth: 0 ft.
Slope: Vertical
Approaches
Left Approach
Length: 0 ft.
Slope: Less Than 1%
Vegetation: None
LS Factor: 0.05
Erosion: 0 tons/year
Right Approach
Length: 170 ft.
Slope: 1% to 5%
Vegetation: None
LS Factor: 0.528
Erosion: 0.0712 tons/year
Erosion Information
Total Erosion at Crossing: 0.08 tons/year
Extent of Erosion: Minor
Erosion is occurring and corrective actions can be installed to address the problem.
Notes: Right bank behind wing wall is the detailed location of the erosion.
Location of Erosion
Erosion Dimensions
Eroded Material
Material Eroded
Total Erosion
facing downstream
Length
Width
Depth
Reaching Stream?
(tons/year)
Right Downstream Embankment
10 ft.
6 ft.
1 ft.
yes
Loam
0.0088
Summary Information
Fish Passability 0