Stream Bank Erosion Site PM-011

Total Severity: Minor
Total Points: 22
Information collected by:
Pere Marquette River Watershed, Big South Branch
Troy Twp, Newaygo County
GPS Coordinates: 43.75936 , -85.97521
T16N R14W Sec 27
Owned by Federal
Bank Details
Which Bank? Left
Condition:Toe is undercutting
Erosion Trend:Stable
Percent Veg. Cover: 50-100%
Bank Conditions
Stream Width:40 ft.
Stream Depth:1 ft.
Stream Current:Slow
Eroded Bank Length:68 ft.
Eroded Bank Height:16 ft.
Slope of Eroded Bank:1:1
Texture: Clay
Cause(s) of Erosion
-Bend in river
Recommended Treatment(s)
-Rock riprap
-Tree revetments
General Information
Total Points
22