Stream Bank Erosion Site PM-014

Total Severity: Minor
Total Points: 25
Information collected by:
Pere Marquette River Watershed, Big South Branch
Troy Twp, Newaygo County
GPS Coordinates: 43.77632 , -85.99493
T16N R14W Sec 16
Owned by Federal
Bank Details
Which Bank? Left
Bank Aspect:E
Condition:Both toe and upper bank eroding
Erosion Trend:Increasing
Percent Veg. Cover: 50-100%
Bank Conditions
Stream Width:30 ft.
Stream Depth:3 ft.
Stream Current:Slow
Eroded Bank Length:Small sections ft.
Eroded Bank Height:5 ft.
Slope of Eroded Bank:1:1
Texture: Sand
Cause(s) of Erosion
Other causes: Steepness
Recommended Treatment(s)
-Bank revegetation
-Rock riprap
General Information
BMPs Completed:
Access, just downstream from site 013, USA campsite.
Total Points
25