Stream Bank Erosion Site PM-021

Total Severity: Moderate
Total Points: 28
Information collected by:
Pere Marquette River Watershed, Big South Branch
Troy Twp, Newaygo County
GPS Coordinates: 43.78831 , -86.02369
T16N R14W Sec 7
Owned by Federal
Bank Details
Which Bank? Right
Bank Aspect:E
Condition:Toe is Stable, upper bank eroding
Erosion Trend:Stable
Percent Veg. Cover: 10-50%
Bank Conditions
Stream Width:20 ft.
Stream Depth:3 ft.
Stream Current:Slow
Eroded Bank Length:200+ ft.
Eroded Bank Height:24 ft.
Slope of Eroded Bank:2:1
Texture: Sand
Cause(s) of Erosion
-Bend in river
Recommended Treatment(s)
-Bank revegetation
General Information
BMPs Completed:

Rock riprap added at toe.

Access: Red Pine plantings 

Total Points
28