Stream Bank Erosion Site 9S14

Total Severity: Minor
Total Points: 19
Information collected by:
Huron Pines
Thunder Bay River Watershed, Thunder Bay River
Alpena, Alpena County
GPS Coordinates: 45.0684756 , -83.4504624
T31N R8E Sec 22
Owned by County
Site Access:Yes
Distance to road:20 ft.
Bank Details
Which Bank? Right
Bank Aspect:Northeast
Condition:Toe is stable upper bank eroding
Erosion Trend:Stable
Percent Veg. Cover: 51-100%
Bank Conditions
Stream Width:250 ft.
Stream Depth:1 ft.
Stream Current:Slow
Eroded Bank Length:100 ft.
Eroded Bank Height:8 ft.
Slope of Eroded Bank:2H:1V
Texture: Sand
Cause(s) of Erosion
-Foot traffic
Recommended Treatment(s)
General Information
Project Details
Year Inventory Completed: 2021
Total Points
19