Stream Bank Erosion Site 9S03

Total Severity: Moderate
Total Points: 28
Information collected by:
Huron Pines
Thunder Bay River Watershed, Thunder Bay River
Alpena, Alpena County
GPS Coordinates: 45.06714245 , -83.46365135
T31N R8E Sec 21
Owned by other
Site Access:Yes
Distance to road:500 ft.
2018
2019
2020
2021
2022
Bank Details
Which Bank? Right
Bank Aspect:East
Condition:Toe and upper bank eroding
Erosion Trend:Stable
Percent Veg. Cover: 0-10%
Bank Conditions
Stream Width:200 ft.
Stream Depth:1 ft.
Stream Current:Slow
Eroded Bank Length:150 ft.
Eroded Bank Height:30 ft.
Slope of Eroded Bank:Vertical to 1H:1V
Texture: Sand
Cause(s) of Erosion
-Bend in river
-Foot traffic
Recommended Treatment(s)
General Information
Project Details
Year Inventory Completed: 2022
Total Points
28