Stream Bank Erosion Site 9S03A

Total Severity: Minor
Total Points: 33
Information collected by:
Huron Pines
Thunder Bay River Watershed, Thunder Bay River
Alpena, Alpena County
GPS Coordinates: 45.06744599 , -83.46433654
T31N R8E Sec 21
Owned by other
Site Access:No
2022
Bank Details
Which Bank? Right
Bank Aspect:Northeast
Condition:Toe and upper bank eroding
Erosion Trend:Increasing
Percent Veg. Cover: 51-100%
Bank Conditions
Stream Width:200 ft.
Stream Depth:0.5 ft.
Stream Current:Slow
Eroded Bank Length:20 ft.
Eroded Bank Height:10 ft.
Slope of Eroded Bank:Vertical to 1H:1V
Texture: Sand, Loam
Cause(s) of Erosion
-Foot traffic
Recommended Treatment(s)
General Information
Project Details
Year Inventory Completed: 2022
Total Points
33