Stream Bank Erosion Site 9S07

Total Severity: Minor
Total Points: 30
Information collected by:
Huron Pines
Thunder Bay River Watershed, Thunder Bay River
Alpena, Alpena County
GPS Coordinates: 45.0675989900001 , -83.4726267999999
T31N R8E Sec 20
Owned by Private
Site Access:Yes
Distance to road:20 ft.
2018
2019
2020
2021
2022
Bank Details
Which Bank? Right
Bank Aspect:Northeast
Condition:Toe is stable upper bank eroding
Erosion Trend:Stable
Percent Veg. Cover: 11-50%
Bank Conditions
Stream Width:200 ft.
Stream Depth:0.5 ft.
Stream Current:Slow
Eroded Bank Length:60 ft.
Eroded Bank Height:4 ft.
Slope of Eroded Bank:Vertical to 1H:1V
Texture: Sand, Loam
Cause(s) of Erosion
-Bend in river
Recommended Treatment(s)
General Information
Project Details
Year Inventory Completed: 2022
Total Points
30