Stream Bank Erosion Site NPN04

Total Severity: Minor
Total Points: 26
Information collected by:
Huron Pines
Thunder Bay River Watershed, Thunder Bay River
Maple Ridge Twp, Alpena County
GPS Coordinates: 45.1259586100001 , -83.60815121
T32N R7E Sec 32
Owned by Private
Site Access:Yes
Distance to road:300 ft.
2019
2020
2021
2022
Bank Details
Which Bank? Left
Bank Aspect:South
Condition:Toe is undercutting
Erosion Trend:Stable
Percent Veg. Cover: 51-100%
Bank Conditions
Stream Width:100 ft.
Stream Depth:5 ft.
Stream Current:Slow
Eroded Bank Length:100 ft.
Eroded Bank Height:2 ft.
Slope of Eroded Bank:2H:1V
Texture: Sand over Clay
Cause(s) of Erosion
-Bend in river
Recommended Treatment(s)
General Information
Project Details
Year Inventory Completed: 2022
Total Points
26