Stream Bank Erosion Site NPS03

Total Severity: Moderate
Total Points: 27
Information collected by:
Huron Pines
Thunder Bay River Watershed, Thunder Bay River
Maple Ridge Twp, Alpena County
GPS Coordinates: 45.0970061300001 , -83.5688142
T31N R7E Sec 10
Owned by County
Site Access:No
2019
2020
2021
2022
Bank Details
Which Bank? Right
Bank Aspect:Northwest
Condition:Toe and upper bank eroding
Erosion Trend:Stable
Percent Veg. Cover: 11-50%
Bank Conditions
Stream Width:2200 ft.
Stream Depth:0.5 ft.
Stream Current:Slow
Eroded Bank Length:60 ft.
Eroded Bank Height:20 ft.
Slope of Eroded Bank:Vertical to 1H:1V
Texture: Sand, Loam
Cause(s) of Erosion
-Bend in river
-Foot traffic
Recommended Treatment(s)
General Information
Project Details
Year Inventory Completed: 2022
Total Points
27