Road Stream Crossing Site EUP_BMIC_RSX316

Charlotte River Watershed
Ponty
Chippewa County
Information collected by:
Bay Mills Indian Community
Site Location
GPS Coordinates: 46.4186180310001,-84.603766553
T 047N R 002 Sec 31
Owned by Private/residential on both sides
Fish Passability: Barrier
Perch Height: 0.4 ft.
Total Erosion: 0.26 tons/year
Overall Score: 25
Severity: Severe
Date Inventoried: 10/1/2020
Crossing Information*
Type of Crossing: Culvert(s)
Number of Structures: 1
Structure Shape: Round
Inlet Type: Apron
Outlet Type: Freefall into Pool
Structure Material: Concrete
Structure Substrate: None
General Conditions: Light superficial corrosion or abrasion or chipping or spalling or cracking. No shape changes (described above).
Structure Interior: Smooth
Is Structure Rusted through? No
Dimensions of Structure: Length 76 ft. Width 2.8 ft. Height 3.3 ft.
Percentage Plugged: None or 0%
Percentage Crushed: None or 0%
Perch Height: 0.4 ft.
Structure Inlet
Water Depth: 0.04 ft.
Embedded Depth of Structure: 0 ft.
Water Velocity*: 1 ft./sec.
Structure Outlet
Water Depth: 0.1 ft.
Embedded Depth of Structure: 0 ft.
Water Velocity*: 1 ft./sec.
*Water Velocities were measured at the surface (via Float Test).
Stream Information
Stream Flow: = Bankfull – Water has completely filled the stream channel, but is not flowing onto the floodplain.
Stream Flow Type: Perennial (if flowing during the time of assessment.)
Is Scour Pool Present? Yes
Scour Pool: Length 6 ft., Width 8.4 ft., Depth 1 ft.
Is Upstream Ponding Present? No
Riffle Information
Road Information
Road Surface: Paved
Owner: County
Road Condition: New Pavement or Well Graded, Same condition as initial placement.
Road Core Integrity: Good (no symptoms of lack of integrity)
Road Width at Culvert: 34 ft.
Location of Low Point: At Stream
Runoff Path: Ditch
Embankments
Upstream
Fill Depth: 20.4 ft.
Slope: Moderate, 2:1, 22.5°, or 41%
Downstream
Fill Depth: 18.6 ft.
Slope: Moderate, 2:1, 22.5°, or 41%
Approaches
Left Approach
Length: 300 ft.
Slope: 1-5%
Vegetation: Partial, Ditch has some vegetation and some bare, eroding places.
Erosion Estimate: 0.16 tons/year
Right Approach
Length: 200 ft.
Slope: 1-5%
Vegetation: Heavy, Ditch is fully vegetated or rip-rapped with no signs of erosion.
Erosion Estimate: 0.1 tons/year
Erosion Information
Estimate of Total Erosion at Crossing: 0.26 tons/year
Summary Information
Fish Passability: Barrier
Is a future visit to this site recommended? No
Were any non-native species observerd at this site? No
*These data are maintained in the Michigan DNR Road Stream Crossing Inventory.