Road Stream Crossing Site EUP_BMIC_RSX102

Waishkey River Watershed, Unnamed
Chippewa County
Information collected by:
Bay Mills Indian Community
Site Location
GPS Coordinates: 46.386202,-84.530627
T 046NN R 002W Sec 14
Fish Passability: Barrier
Perch Height: 0.58 ft.
Total Erosion: 0.12 tons/year
Overall Score: 32
Severity: Severe
Date Inventoried: 12/1/2020
Crossing Information*
Type of Crossing: Culvert(s)
Number of Structures: 1
Structure Shape: Round
Inlet Type: Projecting
Outlet Type: Freefall into Pool
Structure Material: Plastic
Structure Substrate: None
General Conditions: Light superficial corrosion or abrasion or chipping or spalling or cracking. No shape changes (described above).
Structure Interior: Smooth
Is Structure Rusted through? No
Dimensions of Structure: Length 67 ft. Width 2 ft. Height 2 ft.
Percentage Plugged: 1% - 20% Inlet
Percentage Crushed: None or 0%
Perch Height: 0.58 ft.
Structure Inlet
Water Depth: 0.125 ft.
Embedded Depth of Structure: 0 ft.
Water Velocity*: 1 ft./sec.
Structure Outlet
Water Depth: 0.042 ft.
Embedded Depth of Structure: 0 ft.
Water Velocity*: 1 ft./sec.
*Water Velocities were measured at the surface (via Float Test).
Stream Information
Stream Flow: = Bankfull – Water has completely filled the stream channel, but is not flowing onto the floodplain.
Stream Flow Type: Perennial (if flowing during the time of assessment.)
Is Scour Pool Present? Yes
Scour Pool: Length 7 ft., Width 3 ft., Depth 0.83 ft.
Is Upstream Ponding Present? No
Riffle Information
Road Information
Road Surface: Paved
Owner: County
Road Condition: New Pavement or Well Graded, Same condition as initial placement.
Road Core Integrity: Good (no symptoms of lack of integrity)
Road Width at Culvert: 23 ft.
Location of Low Point: At Stream
Runoff Path: Ditch
Embankments
Upstream
Fill Depth: 17 ft.
Slope: Gentle, 3:1, 15°, or 33%
Downstream
Fill Depth: 25 ft.
Slope: Moderate, 2:1, 22.5°, or 41%
Approaches
Left Approach
Length: 200 ft.
Slope: 1-5%
Vegetation: Heavy, Ditch is fully vegetated or rip-rapped with no signs of erosion.
Erosion Estimate: 0.07 tons/year
Right Approach
Length: 150 ft.
Slope: 1-5%
Vegetation: Heavy, Ditch is fully vegetated or rip-rapped with no signs of erosion.
Erosion Estimate: 0.05 tons/year
Erosion Information
Estimate of Total Erosion at Crossing: 0.12 tons/year
Summary Information
Fish Passability: Barrier
Is a future visit to this site recommended? No
Were any non-native species observerd at this site? No
*These data are maintained in the Michigan DNR Road Stream Crossing Inventory.