Road Stream Crossing Site EUP_BMIC_RSX252

Waishkey River Watershed, Bons Creek
Chippewa County
Information collected by:
Bay Mills Indian Community
Site Location
GPS Coordinates: 46.3444995988385,-84.6966922117059
T 046N R 003 Sec 33
Fish Passability: Not a Barrier
Structure is NOT Perched
Total Erosion: 0.11 tons/year
Overall Score: 24
Severity: Moderate
Date Inventoried: 11/24/2020
Road Approach - Left
Road Approach - Left
Road Approach - Right
Road Approach - Right
Inlet
Inlet
Upstream Conditions
Upstream Conditions
Outlet
Outlet
Downstream Conditions
Downstream Conditions
Site Sketch
Site Sketch
Crossing Information*
Type of Crossing: Culvert(s)
Number of Structures: 1
Structure Shape: Round
Inlet Type: Other
Outlet Type: At Stream Grade
Structure Material: Metal
Structure Substrate: Mixture
General Conditions: Moderate deterioration from corrosion or abrasion (small rust flakes or indication that rust is slightly deeper than the surface level) or cracking or spalling or chipping (few minor cracks or localized chipping in the concrete). OR minor shape changes (described above).
Structure Interior: Corrugated
Is Structure Rusted through? No
Dimensions of Structure: Length 69 ft. Width 3.33 ft. Height 3.33 ft.
Percentage Plugged: 41% - 60% Inlet
Percentage Crushed: None or 0%
Structure is NOT Perched
Structure Inlet
Water Depth: 0.83 ft.
Embedded Depth of Structure: 1 ft.
Water Velocity*: 0.33 ft./sec.
Structure Outlet
Water Depth: 1.92 ft.
Embedded Depth of Structure: 0.042 ft.
Water Velocity*: 0.5 ft./sec.
*Water Velocities were measured at the surface (via Float Test).
Additional Comments
Updated by Huron Pines. N. Theisen, S. Peterson
Stream Information
Stream Flow: > Bankfull – Water has filled the stream channel and is flowing onto the floodplain.
Stream Flow Type: Perennial (if flowing during the time of assessment.)
Is Scour Pool Present? No
Is Upstream Ponding Present? No
Riffle Information
Road Information
Road Surface: Paved
Owner: County
Road Condition: New Pavement or Well Graded, Same condition as initial placement.
Road Core Integrity: Good (no symptoms of lack of integrity)
Road Width at Culvert: 20 ft.
Location of Low Point: At Stream
Runoff Path: Ditch
Embankments
Upstream
Fill Depth: 10 ft.
Slope: Moderate, 2:1, 22.5°, or 41%
Downstream
Fill Depth: 26 ft.
Slope: Steep, 1:1, 45°, or 100%
Approaches
Left Approach
Length: 150 ft.
Slope: 1-5%
Vegetation: Heavy, Ditch is fully vegetated or rip-rapped with no signs of erosion.
Erosion Estimate: 0.04 tons/year
Right Approach
Length: 250 ft.
Slope: 1-5%
Vegetation: Heavy, Ditch is fully vegetated or rip-rapped with no signs of erosion.
Erosion Estimate: 0.07 tons/year
Erosion Information
Estimate of Total Erosion at Crossing: 0.11 tons/year
Summary Information
Fish Passability: Not a Barrier
Is a future visit to this site recommended? No
Were any non-native species observerd at this site? No
Site Comments: Inlet is projecting that connects to larger culvert that sicks straight up