Road Stream Crossing Site EUP_MRW03

Munuscong River Watershed, Unnamed
E Swede Rd
Mackinac County
Information collected by:
Huron Pines
Site Location
GPS Coordinates: 46.0574525,-84.2640456
T 042N R 001 Sec 11
Fish Passability: Barrier at Most Flows
Structure is NOT Perched
Total Erosion: 0.37 tons/year
Overall Score: 9
Severity: Minor
Date Inventoried: 8/4/2021
Road Approach - Left
Road Approach - Left
Road Approach - Right
Road Approach - Right
Inlet
Inlet
Upstream Conditions
Upstream Conditions
Outlet
Outlet
Downstream Conditions
Downstream Conditions
Representative Reach
Representative Reach
Site Sketch
Site Sketch
Crossing Information*
Type of Crossing: Culvert(s)
Number of Structures: 1
Structure Shape: Round
Inlet Type: Projecting
Outlet Type: At Stream Grade
Structure Material: Metal
Structure Substrate: None
General Conditions: No deficiencies. New structure or nearly new condition.
Structure Interior: Corrugated
Is Structure Rusted through? No
Dimensions of Structure: Length 25 ft. Width 2 ft. Height 2 ft.
Percentage Plugged: None or 0%
Percentage Crushed: None or 0%
Structure is NOT Perched
Structure Inlet
Water Depth: 0.2 ft.
Embedded Depth of Structure: 0 ft.
Water Velocity*: 0 ft./sec.
Structure Outlet
Water Depth: 0.4 ft.
Embedded Depth of Structure: 0 ft.
Water Velocity*: 0 ft./sec.
*Water Velocities were measured at the surface (via Flow Meter).
Stream Information
Stream Flow: = Bankfull – Water has completely filled the stream channel, but is not flowing onto the floodplain.
Stream Flow Type: Concentrated Wetland Flow.
Is Scour Pool Present? No
Is Upstream Ponding Present? No
Riffle Information
Water Depth: 0 ft.
Bankfull Width: 0 ft.
Wetted Width: 0 ft.
Water Velocity: 0 ft./sec. (measured via Flow Meter)
Dominant Substrate: Organics – decomposing plant material
Road Information
Road Surface: Gravel
Owner: County
Road Condition: New Pavement or Well Graded, Same condition as initial placement.
Road Core Integrity: Good (no symptoms of lack of integrity)
Road Width at Culvert: 19 ft.
Location of Low Point: At Stream
Runoff Path: Ditch
Embankments
Upstream
Fill Depth: 0.5 ft.
Slope: Gentle, 3:1, 15°, or 33%
Downstream
Fill Depth: 0.5 ft.
Slope: Gentle, 3:1, 15°, or 33%
Approaches
Left Approach
Length: 200 ft.
Slope: < 1%
Vegetation: None, Ditch has been recently graded and is bare of vegetation.
Erosion Estimate: 0.06 tons/year
Right Approach
Length: 1000 ft.
Slope: < 1%
Vegetation: Partial, Ditch has some vegetation and some bare, eroding places.
Erosion Estimate: 0.31 tons/year
Erosion Information
Estimate of Total Erosion at Crossing: 0.37 tons/year
Location of Erosion
Erosion Dimensions
Eroded Material
Material Eroded
Extent of Erosion
Estimated Erosion
facing downstream
Length
Width
Depth
Reaching Stream?
(tons/year)
Left Upstream Embankment
2 ft.
1 ft.
1 ft.
Yes
Gravel
Minor (corrective actions recommended)
0
Left Downstream Embankment
3 ft.
0.5 ft.
1 ft.
Yes
Gravel
Minor (corrective actions recommended)
0
Summary Information
Fish Passability: Barrier at Most Flows
Is a future visit to this site recommended? No
Were any non-native species observerd at this site? No
Site Comments: Not a barrier. Rep reach unattainable, wetland