Road Stream Crossing Site EUP_MRW24

Munuscong River Watershed, Taylor Creek
1 Mile Rd
Mackinac County
Information collected by:
Huron Pines
Site Location
GPS Coordinates: 46.1224311,-84.3841686
T 043N R 001 Sec 14
Fish Passability: Barrier
Structure is NOT Perched
Total Erosion: 0.52 tons/year
Overall Score: 13
Severity: Severe
Date Inventoried: 8/5/2021
Road Approach - Left
Road Approach - Left
Road Approach - Right
Road Approach - Right
Inlet
Inlet
Upstream Conditions
Upstream Conditions
Outlet
Outlet
Downstream Conditions
Downstream Conditions
Representative Reach
Representative Reach
Site Sketch
Site Sketch
Crossing Information*
Type of Crossing: Bridge
Number of Structures: 1
Structure Shape: Open Bottom Square/Rectangle
Inlet Type: Headwall
Outlet Type: Cascade Over Riprap
Structure Material: Concrete
Structure Substrate: None
General Conditions: Light superficial corrosion or abrasion or chipping or spalling or cracking. No shape changes (described above).
Structure Interior: Smooth
Is Structure Rusted through? No
Dimensions of Structure: Length 28 ft. Width 42 ft. Height 7.5 ft.
Percentage Plugged: None or 0%
Percentage Crushed: None or 0%
Structure is NOT Perched
Structure Inlet
Water Depth: 1.4 ft.
Embedded Depth of Structure: 0 ft.
Water Velocity*: 1 ft./sec.
Structure Outlet
Water Depth: 0.6 ft.
Embedded Depth of Structure: 0 ft.
Water Velocity*: 4.3 ft./sec.
*Water Velocities were measured 0.4 ft. below the surface (via Flow Meter).
Stream Information
Stream Flow: < 1/2 Bankfull – The stream channel is less than half filled with water.
Stream Flow Type: Perennial (if flowing during the time of assessment.)
Is Scour Pool Present? Yes
Scour Pool: Length 1 ft., Width 22 ft., Depth 3 ft.
Is Upstream Ponding Present? No
Riffle Information
Water Depth: 1 ft.
Bankfull Width: 28 ft.
Wetted Width: 23 ft.
Water Velocity: 0.7 ft./sec. (measured via Flow Meter)
Dominant Substrate: Sand – particles are smaller than a pinhead and feel gritty between fingers
Road Information
Road Surface: Gravel
Owner: State,County
Road Condition: Old Pavement or Rutted, Minor cracking or rutting/ponding at crossing all or part of crossing length.
Road Core Integrity: Good (no symptoms of lack of integrity)
Road Width at Culvert: 22 ft.
Location of Low Point: Other
Runoff Path: Ditch
Embankments
Upstream
Fill Depth: 0 ft.
Slope: Vertical, 0:1, or 90°
Downstream
Fill Depth: 0 ft.
Slope: Vertical, 0:1, or 90°
Approaches
Left Approach
Length: 200 ft.
Slope: 1-5%
Vegetation: Heavy, Ditch is fully vegetated or rip-rapped with no signs of erosion.
Erosion Estimate: 0.52 tons/year
Right Approach
Length: 0 ft.
Slope: 1-5%
Vegetation: Heavy, Ditch is fully vegetated or rip-rapped with no signs of erosion.
Erosion Estimate: 0 tons/year
Erosion Information
Estimate of Total Erosion at Crossing: 0.52 tons/year
Summary Information
Fish Passability: Barrier
Is a future visit to this site recommended? No
Were any non-native species observerd at this site? Yes, Birds-foot trefoil, queen anne's lace, spotted knapweed, burdock, mullein.
Site Comments: Representative reach estimated due to private land
*These data are maintained in the Michigan DNR Road Stream Crossing Inventory.