Home>Counties>Emmet>Streambank Erosion
Emmet County Streambank Erosion
Site No.
Township
County
Stream
Length
Texture
Treatment
Maple River Twp
Emmet
80 ft.
Sand
-Bank revegetation
Other Treatments:revegetation on eupper slope or log terracing
Maple River Twp
Emmet
100 ft.
Sand
-Bank revegetation
-Rock riprap
Other Treatments:shrubs on rock, log terracing
Maple River Twp
Emmet
30 ft.
Sand
-Bank revegetation
-Tree revetments
Other Treatments:shrubs, brush
Maple River Twp
Emmet
10 ft.
Sand
-Tree revetments
Other Treatments:log terracing, beaver dam removal, then trees or log cable
Maple River Twp
Emmet
15 ft.
Sand
-Bank revegetation
-Rock riprap
Other Treatments:log terracing, remove beaver dam?
Maple River Twp
Emmet
50 ft.
Sand
-Bank revegetation
-Tree revetments
Other Treatments:log terracing
Maple River Twp
Emmet
40 ft.
Sand
-Bank revegetation
-Rock riprap
Other Treatments:log terracing
Maple River Twp
Emmet
30 ft.
Sand
-Bank revegetation
-Rock riprap
Other Treatments:log terracing
This page last updated on 5/5/2021.